ZOLO ACB50 Hydraulic Self Climbing Formwork System Introduction
This model of formwork can support structure for the construction of core wall ,bridge pier, pillar, silo etc. and other vertical structures without crane (worked by hydraulic and mechanical mechanisms). The steel rail and the bracket can inter-climbing and the whole system will climb up steadily. It is easy to operate ,highly efficient and safe. This is one best choice for high rise building ,bridge construction project.
ZOLO ACB50 Structure Sketch
ZOLO ACB50 Climbing Process
The climbing process consists of the successive elevation of the mast and the climbing bracket-formwork-set erection along the wall surface.
ZOLO ACB50 Advantages
1. | Crane Independent, speed up the construction procedures and pace. |
2. | Flexible and versatile for all types of requirement in the construction of high-rise buildings, bridge pier and pillar. |
3. | Easy to adapt due to Conventional System components: closures, installation of platforms, safety and cone recovery |
4. | Operational even in adverse weather conditions |
5. | High load capacity. Hydraulic power unit operates up to 30 cylinders simultaneously.Large formwork sets can be easily lifted. |
6. | The system will not down to ground until whole constrution work completed, so it save more site space and improve the site
management. |
ZOLO ACB50 System Parameters | |
Model No. | ACB-50 |
Hydraulic System Working Pressure | 50KN |
Platform Quantity | 4~6 |
Max. loading of Operating Platform | 1.7KN/Sqm. |
Height of Bracket | 10-15 meters |
Height of Climbing Per Time | 2.7-4.8 meters |
Climbing Speed | 6 meters/hour |
Weight | 1330KGS per set |
ZOLO ACB50 KEY PARTS SHOW