Zolo ACB100 Automatic Hydraulic Self Climbing Formwork

ZOLO ACB100 Hydraulic Self Climbing Formwork System Introduction     This model of formwork can support structure for the construction of  core wall ,bri ...
BASIC INFO

ZOLO ACB100 Hydraulic Self Climbing Formwork System Introduction

    This model of formwork can support structure for the construction of  core wall ,bridge pier, pillar, silo etc. and other vertical structures without crane (worked by hydraulic and mechanical mechanisms).  The steel rail and the bracket can inter-climbing and the whole system will climb up steadily.  It is easy to operate ,highly efficient and safe. This is one best choice for high rise building ,bridge construction project.

ZOLO ACB100  Structure Sketch

Climbing Process

ZOLO ACB100  Advantages

1.Crane Independent, speed up the construction procedures and pace.
2.Flexible and versatile for all types of requirement in the construction of high-rise buildings, bridge pier and pillar.
3.Easy to adapt due to Conventional System components: closures, installation of platforms, safety and cone recovery
4.Operational even in adverse weather conditions
5.High load capacity. Hydraulic power unit operates up to 30 cylinders simultaneously.Large formwork sets can be easily lifted.
6.The system will not down to ground until whole constrution work completed, so it save more site space and improve the site management.
ZOLO ACB100  System Parameters
Model  No.ACB-100
Hydraulic System Working Pressure 100KN
Platform Quantity4~6
Max. loading of Operating  Platform3.5KN/Sqm.
Height of Bracket12-17 meters
Height of Climbing Per Time2.7-4.8 meters
Climbing Speed6 meters/hour
Weight2250KGS per set

ZOLO ACB100  Application in Site

​​

​​